Using a measuring tape, measure the length and width of your garage to ensure a perfect fit.

When your floor arrives, remove everything from your garage. Sweep your existing concrete floor thoroughly to eliminate any dirt or dust.

Begin by lining up your new floor (leaving room for edging) at the garage door opening. Ensure that, when the garage door is closed, the floor and edges are completely inside the garage door.

Ensure all loops on the tiles are facing the same direction – the direction you’ll be installing the floor. Lay the tiles in an L-shape along the garage door opening and the left wall.

Read our tips and tricks on maintaining and cleaning your Gorilla Grids® tiles for clean, long-lasting flooring solutions for every space.

From garages and patios to gyms and courts, Gorilla Grids® adapt to a wide range of spaces with durability you can trust.